University of Toronto Breathing Wall - 2005
Although not the largest, it is to date the most dramatic
installation to date. The installation has examples of all the technologies
developed so far by Genetron Systems and as such, is a show case for them.

The
system even addresses the affordable issue, in that it has been designed to be
delivered in two stages…..the ‘breathing walls’ to be delivered as stage two.
The room also has been heavily equipped with state of the art computer
environmental control systems. It is hoped that the tool can be developed to
measure air quality in real time……an instrument that does not yet exist in the
market…..to then also clearly demonstrate the effectiveness of ‘Breathing Wall’
ecosystems.
Completed in 2005.